Project Brief Location Contract Waterfall Environment Benefits Our Consultants Advertisement
      Waterfall
The National Environmental (Upper Kotmale Hydro-power Project-Monitoring) Regulations No.1 of 2003 set out a number of meaures that must be implemented by the project. They include measures to ensure flows are maintained over waterfall so continuing to provide a spectacle for visitors to the area.

The UKHP is required to keep a photographic record of the falls in the area and to install flow measuring devices above a number of falls. Click on the names of the falls to view photographs.

Flow data will be added once the meters are installed.

D
St.Clairs Waterfall
D      
 
 
    Top^
 
Home | Location | Project Brief | Contract | Waterfalls | Environment | Benefits | Our Consultants | Advertisements | Contact Us
© upper kotmale hydropower project all rights reserved 2004. site by SLTnet.
UKHP Home